Pullenvale
About Pullenvale
Imperial Kitchens completed the Pullenvale project in 2021. The cabinetry was provided as part of a Lark Constructions new house build and consisted of a kitchen, butler’s pantry, laundry, powder room, bathroom, ensuite, bar, and study.
*The images do not show every room, only a kitchen and three vanities.
Pullenvale Project Colour Selections
Kitchen
- Cabinet Colour: Laminex Espresso Flint
- Feature Colour: Laminex Classic Oak Nuance
- Handles: Finger-Pull “Sharknose” Handles
Appliances and Sinks
- Oven: iQ700 Built-in oven 60 x 60 cm Black (HB875G8B1A)
- Cooktop: Franke 96cm Professional Series LPG Gas Cooktop (FIG905B1L)
- Rangehood: Falmec 105cm Gruppo Incasso Under Cupboard Rangehood (F3GI10S1)
- Dishwasher: Serie | 8 fully-integrated dishwasher 60 cm (SMV88TX02A)
- Microwave: iQ700 Built-in compact oven with microwave function 60 x 45 cm Black (CM833GBB1A)
Other Projects
Mackenzie
Imperial Kitchens completed the Mackenzie project in August 2024. The customised kitchen cabinetry was designed and built to our private customers specific requirements.
Taringa
The Taringa project was completed by Imperial Kitchens in January 2024 with customised cabinetry in the kitchen, bathroom and ensuite. Created to a private customers specific requirement, following a personalised onsite consultation with our designer and colour consultant.
Arana Hills
Imperial Kitchens completed the Arana Hills project in November 2023. The customised kitchen cabinetry was designed and built to our private customers specific requirements with the inclusion of trades.